More building development photographs

Staircase is positioned.
First steps are secured to the stair rails, and electrics are in place awaiting plasterboard.
The first of three roof light windows are installed.
Glass screen window frame awaiting fixing.
Raised blocks following concrete infill.
Plastered walls about to have first coat of paint. Mark preparing the entrance hall, removing any damaged paint.
The floor of the main hall is sanded back to bare wood.
Sanding areas of the floor where the wooden blocks have been replaced.
Insert picture as it also shows how the blocks were laid. The glass screen has been completed.
Submitted by Jonathan Furness on Sun, 2006-09-24 22:06.
::