Staircase is positioned. |
|
|
|
|
|
First steps are secured to the stair rails, and electrics are in place awaiting plasterboard.
|
|
|
|
|
|
The first of three roof light windows are installed. |
|
|
|
|
|
|
|
Glass screen window frame awaiting fixing. |
|
|
|
Raised blocks following concrete infill. |
|
|
|
|
|
Plastered walls about to have first coat of paint. |
|
Mark preparing the entrance hall, removing any damaged paint. |
|
|
|
|
|
The floor of the main hall is sanded back to bare wood. |
|
|
|
Sanding areas of the floor where the wooden blocks have been replaced. |
|
|
|
|
|
|
|
|
|
|
|
Insert picture as it also shows how the blocks were laid. |
|
The glass screen has been completed. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|